PROYECTO INTEGRAL QUE CONTEMPLA LA CONSTRUCCIÓN DEL TUNEL UBICADO EN EL KM 6+940
Extraído automáticamente de las bases. Verifica siempre en el documento oficial.
| Partida |
|---|
| A PRECIO ALZADO: Engineering studies, executive project elaboration, and tunnel construction at km 6+940 with 200.0 meter length, including portals, earthworks, drainage works, structure, paving, induced works, complementary works, signage, electrical installations and lighting |
| A PRECIOS UNITARIOS: Construction of cuts, shotcrete, subgrade layer, hydraulic base, prime coat, asphalt surface in accesses, concrete and ditches |