RECONSTRUCCIÓN DE LOS CAMINOS: SAN JUAN AHUEHUECO-HUATEPANGO HGO
Extraído automáticamente de las bases. Verifica siempre en el documento oficial.
| Partida | Cant. | Unidad |
|---|---|---|
| E.P.01Deshierbe (Weeding) - manual and/or mechanical elimination of vegetation, including loading to transport units | — | m² (square meters) |
| E.P.02Revestimiento con material de préstamo de banco (Embankment with quarry material) - sieved to eliminate particles larger than 75mm, includes loading to transport units | — | m³ (cubic meters) |
| E.P.03Conformación de cunetas de sección triangular (Formation of triangular section ditches) | — | m (meters) |